Sta-Built Construction built a gray block grade wall along the fence line of a Vancouver, WA side yard in January 2026 and filled behind it to make a level pad about 10 ft by 17 ft. A 24 ft step build with block side walls now climbs the bank to the deck, and a new dual-door gate closes the side yard off from the driveway.
Project Details
- Location: Vancouver, WA 98686
- Service: Retaining wall, level pad and block step build
- Wall height: 1 ft at the driveway end, stepping up to 3 ft at the deck end
- Pad size: About 9 ft 11 in by 16 ft 10 in, with a 12 ft 6 in opening at the driveway
- Steps: 24 linear ft, eight steps at 3 ft wide, Diamond step blocks
- Step side walls: About 100 sq ft of block on both sides of the stair
- Fill and base: Fill dirt and 5/8 inch crushed rock, graded and compacted
- Gate: New dual-door gate, mostly from the existing fence material
- Completed: January 2026
- Project investment range: $9,700 to $12,000
- Warranty: 17-Year Craftsmanship Warranty
Before and after
What we found
The ground between the house and the fence was soft, mossy and lower than the concrete, with nothing holding it at the fence line. It was unusable in winter. Past it, the grade climbed toward the deck with no stair, so the only way to the upper yard was up the bank.
What we built
The wall runs along the existing fence line. It starts about 1 ft high near the driveway and steps up to about 3 ft at the deck end, following the rise of the lot. Behind it we brought the pad up with fill dirt and 5/8 inch crushed rock and compacted it level.
The bank got a stair: eight 3 ft wide steps in Diamond step block, with block side walls on both sides so the slope stays off the treads. At the driveway end we built a dual-door gate, reusing most of the existing fence boards.
How the work went
Material arrived on January 21. The wall went in first, so the fill had something to bear against, and we compacted the base ahead of each course and laid fabric along the house side of the pad before the rock went in. The stair was built into the bank after the wall, and the gate was hung at the end of the month.
The pad took about 13 cubic yards of material, not the 6 that its finished size suggests, because compaction takes about 30 percent out of loose fill. Fill figured from the finished dimensions alone comes up short, and the pad settles.
What this project cost
Project investment range: $9,700 to $12,000. This range reflects the scope of this completed project and is not a current quote. The wall itself is short. What adds to the price is everything attached to it: the stair is a second structure with its own base and side walls, and the fill takes more yardage than the finished size suggests.
Related questions
Why build side walls along steps cut into a slope?
Without them, soil beside each tread washes or slides onto the steps. Side walls hold the bank back and give the stair a clean edge from bottom to top.
Can existing fence boards be reused for a new gate?
Often, if the boards and posts are sound. On this project most of the existing fencing was reused, with new framing and hardware for the two doors.
Planning something similar?
If a side yard is too soft to use in winter, or the way up to the back of your lot is a bank instead of a stair, we can walk it with you and lay out what a wall and steps would take. See our Vancouver service area. Related project: a side yard paver walkway on a 64 ft grade wall in Vancouver. Book a free design consultation or call Sta-Built Construction at (360) 338-0533.
This project documentation was prepared by Sta-Built Construction from the project records and photos from our crew, November 2026. Technical review by Ben Metsker, Manager.