Seattle Paver Walkway Installation: ADU Paths and Step Landing

Bare dirt around a new backyard ADU in Seattle, WA finished with about 508 sq ft of Camino paver walkways, a step landing at the door,…

Home › Portfolio › Paver Walkways in Seattle, WA

Sta-Built Construction built about 508 sq ft of paver walkways, a step landing and a small patio around a newly finished backyard ADU in Seattle, WA in March 2026. We also relaid the homeowner’s existing pavers at the alley entrance and put in new sod.

Project Details

  • Location: Seattle, WA 98117
  • Service: Paver walkways with a step landing and small patio
  • Project size: About 508 sq ft of pavers, plus 137 sq ft of new sod
  • Existing surface: Bare dirt and bark around a new ADU; old cobble pavers at the alley entrance
  • Field paver: Camino pavers in Pewter, two-piece running bond
  • Border: Charcoal border course
  • Step landing: 3 ft by 4 ft landing at the ADU door, Cambridge riser in Chateau, charcoal coping tread
  • Bed edging: Wall block set on edge in Chateau and Charcoal along the planting beds
  • Completed: March 2026
  • Project investment range: $18,000 to $22,200
  • Warranty: 27-Year Craftsmanship Warranty

Before and after

Bare side yard with stacked wall block and gravel beside a new ADU before paver walkways, Seattle, WA
February 2026, after the ADU was built.
Small paver patio with outdoor furniture behind an ADU, Seattle, WA
The patio behind the ADU, at the end of the walkway.

What we found

The homeowners had just finished a detached ADU at the back of a city lot that runs through to an alley. Construction left bare dirt and bark around it, with no finished path from the main house and no landing at the ADU door. Their old cobble pavers and some wall block were stacked beside the new building.

What we built

We laid out connected paver paths: a straight walkway down each side of the ADU, a 3 by 4 ft step landing at the door, a small patio behind the building, and a paver pad at the alley. The old pavers did not match the new Camino, so we used new pavers for the walkways and patio and relaid the homeowner’s original pavers at the alley entrance, where they had been before. Both are laid in running bond so the whole system reads the same.

Along the planting beds, wall block set on edge holds the soil back from the walkway. We cut a section of the existing concrete path to tie the new pavers in.

How the work went

The install took three days, March 24 to 26. We graded and compacted a crushed rock base along the ADU, then laid the side walkways, built the step landing and finished the patio, cutting the charcoal border to follow the curve where the walkway opens into the patio. The alley pad was relaid and the beds planted by early April.

Compacted crushed rock base beside stacked pavers for a walkway
March 24, the base for the patio area.
Paver walkway in running bond with a charcoal border and a step landing at an ADU door
The side walkway ends at the new landing and coping tread.

What this project cost

Project investment range: $18,000 to $22,200. This range reflects the scope of this completed project and is not a current quote. About 508 sq ft spread across several narrow runs costs more per square foot than one open patio of the same size, because every walkway has two border edges to cut and every corner adds layout time.

Related questions

Can existing pavers be reused in a new project?

Often, if they are intact. They are lifted, cleaned up and relaid on a new compacted base. If they will sit next to new pavers, it usually works best to keep them in their own area, as at the alley entrance here.

Planning something similar?

If a new ADU or addition left your yard as bare dirt, we can walk the space and recommend the paths, landings and edges to finish it. See our Seattle service area. Related Seattle projects: a paver driveway with drainage and a herringbone courtyard patio. Book a free design consultation or call Sta-Built Construction at (360) 338-0533.

This project documentation was prepared by Sta-Built Construction from the project records and photos from our crew, November 2026. Technical review by Ben Metsker, Manager.